Solenoid Valve Test Equipment (WH-FD08-801A)

Model No.: WH-FD08-801A

Product Overview

Precision testing for solenoid and electromagnetic valves — action voltage, response time, gas tightness, flow characteristic and durability. Built for incoming and final QC with full data traceability.

Technical Specifications

Model WH-FD08-801A
Tests Action / Tightness
Channels Multi-channel
Delivery 25–40 Days
Warranty 1 Year + Lifetime Support
Origin Zhongshan, Guangdong, China
MOQ 1 Set (OEM available)
Applicable Standards: Action Test Gas Tightness Response Time Flow Test Durability
  • CE / ISO Certified
  • 100% Factory Inspection
  • 1-Year Warranty
  • OEM / ODM Customization
Parameter Specification
Test Object Solenoid valves, electromagnetic gas valves
Action Test Opening/closing voltage & response time
Tightness Leak detection under rated pressure
Flow Test Flow characteristic measurement
Durability Cyclic operation with failure alarm
Channels Multi-channel simultaneous acquisition
Data Traceability and report export
Control Computer + PLC, touch screen HMI
Standards IEC / EN / GB compliant
After-sales 1-year warranty & remote support

Applications

Who Uses This Test Bench

Solenoid Valve Makers

Production-line action and tightness verification.

Gas Appliance Plants

Incoming QC of solenoid gas valves before assembly.

OEM / Tier Suppliers

Custom fixtures and automated judgment for high-mix lines.

Frequently Asked Questions

Answers to common questions from global customers about customization, delivery, certification and after-sales support.

Customized equipment generally takes 30-45 working days from design confirmation. Standard models ship within 15-25 working days. Complex turnkey projects (multiple stations or complete laboratories) take 45-60 working days. We always confirm the delivery date in the order contract and share progress updates.

Our team has more than 20 years of combined experience in the testing equipment industry. We have served 100+ factories and laboratories across 30+ countries, from Southeast Asia to Europe.

We ship by sea (FCL or LCL), air freight or international express depending on the size and urgency. Sea freight to most Asian ports takes 5-15 days, to Europe about 30-40 days; air freight is usually within 7-10 days worldwide.

For turnkey projects we can agree on a milestone payment schedule — for example 30% deposit, 40% before shipment, 20% after installation acceptance and 10% after the warranty period. Specific terms are negotiated per project.

Yes. We provide an English operation manual, video guidance and remote commissioning support. For turnkey projects we can send engineers for on-site installation and operator training. Travel and accommodation costs are quoted separately.

Still have questions about this product?

Ask Us a Question

Get Your Custom Testing Solution & Free Quote

Tell us your test standards, product parameters and customization needs. Our professional engineering team will reply with a detailed scheme and quotation within 24 working hours.

WhatsApp Us