The Range Hood Production Test Station (Model WH-YJ05-301A, line-integrated configuration) is the production-line variant of the range hood test equipment, built for end-of-line quality inspection in hood factories. It applies the same airflow, static-pressure, noise and electrical-safety checks in a fast, fixture-guided sequence with automatic pass/fail judgment, so every hood is verified before packing without manual meter reading.
This variant is delivered as a custom test solution, integrated with the customer’s conveyor and MES. It is the station chosen for kitchen hood QC equipment on high-volume lines, where the independent laboratory bench is too slow for 100% inspection.
End-of-Line QC Checks
- Airflow & pressure — rapid airflow and static-pressure verification at the rated setting.
- Noise screening — production sound-level check; see noise and vibration.
- Electrical safety — insulation, earthing and leakage; see electrical safety.
- Grease filter & function — filter fit and functional checks.
- Automatic verdict — pass/fail and traceable per-unit record.
Standards & Compliance
Production checks apply the IEC 61591 performance method and relevant GB/T standards within IEC/EN/GB electrical safety. For the full research-grade airflow curve, laboratories use the standard range hood test equipment; the integration with gas testing for integrated cookers is shown in the integrated cooker test bench case. See certifications for available documentation.
Key Features
- Fast line-integrated airflow, noise and electrical QC.
- Automatic pass/fail and MES data output.
- Fixture-guided connection for operator efficiency.
- Custom station count and conveyor layout.
Manual vs. Automated Hood Testing
| Parameter | Specification |
|---|
| Test Items | Airflow, static pressure, noise, grease separation, electrical safety |
| Airflow Range | Configurable per hood model |
| Noise Test | Precision sound level measurement |
| Electrical Safety | Withstand voltage, insulation, leakage |
| Control | Touch screen + PLC, automatic data |
| Stations | Single or multi-station |
| Data | Automatic acquisition and report export |
| Power Supply | 220V/50Hz or 110V/60Hz |
| Standards | IEC / EN / GB compliant |
| After-sales | 1-year warranty & remote support |
Applications
- High-volume hood factories — 100% end-of-line inspection.
- OEM/ODM plants — per-batch traceable QC records.
- Integrated cooker lines — combined hood and stove verification.
Line integration and customization are described in custom test-bench lead time and OEM test equipment customization.
Why Manufacturers Choose Wanhe
Wanhe Testing (Zhongshan, Guangdong) builds appliance test equipment in-house with a 1-year warranty, lifetime technical support and OEM/ODM customization. Review compliance credentials on certifications & compliance, the factory-direct model on Factory Direct, and the buyer checklist in how to choose a manufacturer.
- Direct manufacturer — factory pricing with no trading margin; see factory direct vs trading.
- Traceable results — high-accuracy measurement with automatic pass/fail reports.
- Custom engineering — fixtures, stations and MES connection; see custom lead time.
- Export documentation — CE/ISO support and technical files.
Request a Configuration & Quotation
Send us your appliance models, target markets and the standards you must meet. Wanhe engineers will propose the station layout, confirm measurement ranges and quote lead time and MOQ. Use the contact form, or review typical budget ranges in the gas test equipment price guide.
Frequently Asked Questions
How is this different from the standard range hood equipment?
It is the same measurement core configured as a fast, conveyor-integrated production station with automatic judgment; the standard bench is the flexible laboratory/QC version.
Can it connect to MES?
Yes. The station outputs per-unit results to MES/SPC and supports pass/fail diverters; see custom lead time.
Can it run 100% inspection?
Yes — the line-integrated layout is designed for 100% end-of-line checks.