End-of-line performance testing for storage and instant water heaters, and kitchen appliances. Measures water flow, inlet/outlet temperature, voltage, current and power with high-precision sensing and automatic data recording.
Our Home Appliance Performance Test Bench performs cycle durability testing for switches, valves, hinges, thermostats and other moving parts, verifying the long-term reliability of home appliances under repeated use.
Key Features
Multi-station independent control
Automatic cycle counting and failure detection
PLC + touch screen control with data traceability
Customizable fixtures for different product types
Applications
Oven door hinges, gas stove knobs, water heater valves, range hood switches and other appliance components.
Parameter
Specification
Hot Water Flow
0–30 L/min, accuracy 0.5% F.S.
Inlet Pressure
0–1.6 MPa, accuracy 0.5% F.S.
Inlet / Outlet Temp
0–100°C, accuracy 0.5% F.S.
Enclosure Temp
0–100°C, up to 10 channels, 0.5% F.S.
Voltage
0–300V, accuracy 0.5% F.S.
Current
0–20A, accuracy 0.5% F.S.
Power
Up to 5 kW, accuracy 0.5% F.S.
Energy
kWh measurement & logging
Control
Computer + PLC with touch-screen HMI and report export
Performance verification of storage and instant electric water heaters before shipment.
Kitchen Appliance Makers
QC testing of electric ovens, steamers, dishwashers and other kitchen appliances.
Certification Laboratories
Standard-compliant measurement platform with traceable data.
Frequently Asked Questions
Answers to common questions from global customers about customization, delivery, certification and after-sales support.
We support EXW, FOB, CIF and other common Incoterms. For most overseas orders we recommend FOB Shenzhen or Guangzhou; for turnkey projects we can also provide DDP service including customs clearance and inland delivery.
Customized equipment generally takes 30-45 working days from design confirmation. Standard models ship within 15-25 working days. Complex turnkey projects (multiple stations or complete laboratories) take 45-60 working days. We always confirm the delivery date in the order contract and share progress updates.
We ship by sea (FCL or LCL), air freight or international express depending on the size and urgency. Sea freight to most Asian ports takes 5-15 days, to Europe about 30-40 days; air freight is usually within 7-10 days worldwide.
Yes, we accept irrevocable Letter of Credit (L/C) at sight for larger orders. Please provide your issuing bank details and we will confirm the terms with our bank.
For turnkey projects we can agree on a milestone payment schedule — for example 30% deposit, 40% before shipment, 20% after installation acceptance and 10% after the warranty period. Specific terms are negotiated per project.
Tell us your test standards, product parameters and customization needs. Our professional engineering team will reply with a detailed scheme and quotation within 24 working hours.
We use cookies to improve your browsing experience and analyse site traffic. By continuing to browse, you agree to our use of cookies. Learn more in our Privacy Policy