What to Interlock
| Condition | Interlocked action | Failure mode |
|---|---|---|
| Any failed test | Hold unit; block release | Must be retested |
| Exhaust not proved | No gas supplied | Gas stays closed |
| Flame lost | Command shut-off; close valve | Fail safe |
| Overheat | Cut power or gas | Stop |
| Incomplete record | No release | Record needed |
Why the PLC Owns the Interlock
The interlock must be enforced by the controller that directly manages the gas and the gate, not by an information system or by the operator. If the interlock depended on the MES or on a screen, a slow or lost network would remove the protection; held in the PLC, it keeps working and fails safe. The logic should be verified and version-controlled, and manual overrides should be limited, logged and not usable for release. This follows the control separation in G5 and the station design in G1.
Physical and Logical Holding
- A failed unit is physically diverted or stopped rather than allowed to continue;
- Its serial is marked failed and its record keeps the history, described in G6;
- After repair, it must return to the test and pass before it can be released;
- Multiple failures should be recorded rather than overwritten.
A gate that only shows a red light but still allows the unit to pass is not an interlock; the control of the conveyor or the release is part of the function. The operator should be able to see the reason for the failure, but not to clear it without a re-test.
Proving the Interlock
- Induce each failure and confirm the unit is held and the correct action occurs;
- Cut the network, power and sensor in turn and confirm the safe state;
- Attempt a manual override and confirm it is limited, logged and cannot release;
- Verify a repaired unit is re-tested and only then released;
- Repeat after any change to the logic.
The operator interface that displays the result and the reason is described in G8. The common errors are to rely on a visual pass/fail without controlling release, to place the interlock in the MES, or to allow an override that effectively removes the gate. Interlocks that pass these tests remain effective even when the process is under pressure, which is when they are most needed.
Routes by Which an Interlock Is Bypassed
An interlock that is correctly designed can still be defeated in practice by a small number of well-worn routes, and these should be checked rather than assumed away. The first is the software-only gate: the screen shows a red fail and the conveyor stops, but the unit can still be returned to the good line by hand or by moving a limit switch, so the gate is advisory rather than physical. The second is the reset that clears the failure: a single press removes the failed state and treats the unit as new, allowing a retest without a repair or a direct release. The third is the override that is left open for convenience: a maintenance key or a supervisor code becomes common knowledge, so the interlock is bypassed whenever the line is under pressure. The fourth is the external dependence: the gate consults the MES or a shared network and releases on a failed or delayed message. A proven interlock closes each of these routes by combining physical holding with a PLC decision, a required repair and retest, limited and logged overrides, and a local safe state independent of the network.
What a Correctly Interlocked Unit Does
- On a failed test, the station stops and holds the unit, the serial is marked, and the release path remains closed;
- The gas is closed on an unproved exhaust, a lost flame or an overheat, regardless of the operator or the MES;
- The unit is moved to repair, the fault is recorded, and it returns to the same test rather than being marked pass;
- A pass after the retest is the only condition that opens the release, and the full history stays with the serial;
- Power loss, network loss and sensor failure each produce the safe state rather than an open gate.
These conditions should be induced deliberately during commissioning and again after any logic change, because the only evidence that an interlock works is the actual failure test, not the normal behaviour on good units. The interface that displays the reason and the serial system that keeps the history are the supporting parts of the same gate.
Why the Interlock Must Survive a Power Loss
A station that loses power in the middle of a test is a common rather than a rare event, and the state it returns to is part of the interlock. A fail-safe design uses the loss of power to close the gas, so the absence of signal is the safe condition; a unit that was being tested must not be assumed pass when the station restarts, because the sequence was interrupted, and the record should require a return to the test rather than a release. The same logic applies to a power dip that is long enough to reset a sensor but not long enough to stop the line: the interlock should treat the interrupted reading as invalid rather than continuing from a value that may have changed. Because the controller can lose track of its position during a loss, the safe practice is to return to a known state, confirm the exhaust and the connections again, and only then permit the sequence to resume. This removes the dangerous case in which a unit that was never fully tested is carried forward simply because the line restarted around it. The power-loss behaviour is one of the conditions that should be deliberately induced during commissioning, along with the lost network and the failed sensor: the power is removed at each stage, and the station must close the gas, mark the unit incomplete, and refuse to release it. A gate that survives these losses is independent of the surrounding systems; one that depends on continuous power to hold its decision can be defeated by the very interruption that is most likely to occur on a busy line.
Need reliable pass/fail gates?
Wanhe test benches and EOL stations enforce PLC-based interlocks for gas, safety and release, and hold and retest failed units. Tell us your test sequence for a quotation within 24 hours.
Email: wanhe1718@gmail.com | WhatsApp: +86 18307609558 | Zhongshan (Xiaolan), Guangdong
About WANHE TESTING — Zhongshan Wanhe Test Equipment is a factory-direct B2B manufacturer of custom gas cooker and appliance test benches, water heater and boiler rigs, environmental chambers, range hood testers and fatigue machines. CE / ISO 9001 / IEC / EN / GB / RoHS, custom design in 7–15 days, delivered to 30+ countries.