What Each Record Contains
| Field | Purpose | Example |
|---|---|---|
| Serial number | Unique unit identity | Unique, fixed |
| Model / order | Loads the correct test | Appliance type |
| Measured results | Each test and value | Time, CO, tightness |
| Component batches | Trace valves, sensors | Supplier batch |
| Pass/fail / repair | History and release | Retest record |
| Destination | Market and configuration | Gas and voltage |
Preventing Missing or Duplicate Records
The scan is the gate: the station should not start until a valid serial is read and should reject a serial that has already been tested, so two units cannot share a record and a unit cannot be skipped. A unit that fails must keep the same serial through repair and re-test, and its history should show the first failure and the later pass. A unit without a complete record should be held rather than released, since the safety claim cannot be made for it. These controls belong with the pass/fail gate in G7, and the storage is the MES role in G5.
Warranty and Recall
- A warranty claim is answered by recalling the unit’s actual measurements and configuration;
- A defective component batch is traced to the affected serials, limiting a recall to the real units;
- A wrong gas or voltage variant can be found before release rather than after export;
- Repeated failures by serial and batch identify a weak supplier.
Without serial records, every recall must cover the broadest possible set and every warranty claim is open to argument. The claim and warranty process for buyers is covered in Cluster J. The records are also the evidence that the factory performed the safety tests rather than simply stating compliance.
Implementation
- Assign a unique serial and label it before testing;
- Scan at each station and load the correct sequence;
- Record every result and the component batches;
- Keep the serial through repair and re-test;
- Release only on a complete, matched record.
The common error is to allow a test to start without a scan, or to release a unit when its record is incomplete, which is discovered only at the first field complaint. A small line can start with a local spreadsheet or a simple PC record, but the unique serial, the scan gate and the component batch should be present from the start, and the data should be backed up rather than held on a single station. The station count that ensures each unit reaches the scan is described in G2.
Following a Batch Through the Records
A line builds a batch of appliances using a particular valve from a supplier lot and a particular ignition module from another. At each unit, the serial is scanned, the station records the measured results against that serial, and the component batches are entered by the assembly scan or held with the order. Later, the supplier reports that a valve lot can develop an internal leak after service. Instead of recalling every appliance of that model, the factory searches its records for the serials that received that lot and identifies only the affected units, and the same records show where those units were sold. In the same way, a warranty claim on one returned unit is answered by opening its record and seeing the gas pressure, the tightness result and the configuration at the time of the test. The factory can distinguish a manufacturing defect, a service-installation fault and a misuse case from the actual evidence rather than from a guess.
What a Minimal Traceability Setup Still Needs
- A unique, permanent serial label applied before the first test;
- A scan gate that prevents the test from starting without a valid serial and rejects a repeated serial;
- A field for component batches, even if it is entered by order rather than per unit;
- A history that keeps the first failure and the later retest under the same serial;
- A backup of the record, so the data is not held on a single station and lost with it.
A small line can begin with a simple table or a local database and grow into a full MES later; what cannot be deferred is the unique serial, the scan gate and the component batch, because those are the elements that make a recall or a warranty answer possible. Lines that omit them discover the gap only at the first field complaint, when the units cannot be identified and the broadest possible recall is the only option.
Why the Serial Must Stay With the Unit Through Repair
A traceability system loses much of its value when a failed unit is separated from its serial during repair. If the unit is returned to the line as a new item, it receives a second record, the original failure is disconnected from the final pass, and the factory can no longer show what was wrong or whether the repair was retested. The practical rule is that the serial follows the physical unit from the first test to the release, with no second identity and no overwrite; the failure, the repair action and the later pass all sit on the same record in sequence. That history is useful in two ways: it shows the individual unit was genuinely retested, and, when failures are grouped by cause and by component batch, it reveals which part or supplier is generating the rework. The same rule prevents the more dangerous case in which a repaired unit is released without ever returning to the failed test, because the gate is tied to the serial and that serial is still marked failed until a retest passes. The flow of the record should therefore be designed as a loop rather than as a fresh entry — failed units move to repair, the record follows, the same station or a designated retest station runs the test, and the record closes on a pass. Keeping the serial attached to the unit in this way is a small discipline at the bench, but it is the element that makes the later history continuous and the release defensible.
Need serial traceability on your line?
Wanhe test benches and EOL stations scan the serial, load the correct sequence, record results and component batches and release only on a complete record. Send us your model and line for a quotation within 24 hours.
Email: wanhe1718@gmail.com | WhatsApp: +86 18307609558 | Zhongshan (Huangpu), Guangdong
About WANHE TESTING — Zhongshan Wanhe Test Equipment is a factory-direct B2B manufacturer of custom gas cooker and appliance test benches, water heater and boiler rigs, environmental chambers, range hood testers and fatigue machines. CE / ISO 9001 / IEC / EN / GB / RoHS, custom design in 7–15 days, delivered to 30+ countries.